The answer
Use the signed plans and specifications, test accessible finishes and systems room by room, photograph identifiers and defects, record incomplete work, verify included items, and obtain qualified inspection where appropriate. A walkthrough should produce a dated written evidence file, not only a verbal promise list.
Calgary-specific context
Also check Calgary-specific exterior and completion questions such as grading, drainage, seasonal concrete or landscaping work, cladding, eaves, roof visibility from safe locations, winter operability, utilities, permits, occupancy, parking, and active neighbouring construction.
What to do next
Assign every deficiency an exact location, photo, responsible party, promised action, target date, status, and escalation path before treating it as resolved.
Verify before relying
Official sources for this topic
These sources explain the rules and records relevant to this topic. Check the current requirements for your property.
Check the current information at the linked source. Ask the appropriate professional how it applies to your property.
Important
Real estate rules, market conditions, property records, taxes, financing terms, bylaws, and physical conditions can change. Verify time-sensitive and property-specific facts with current official sources and the appropriate qualified professional before acting.
RELATED GUIDES / New builds
Compare the builder, lot and total cost.
Ask for the complete contract, deposit protection, inclusions, GST treatment and delay terms before paying. A nearby permit or a showhome is not proof that your home or its amenities will be completed on schedule.
Official verification: Alberta builder and property warranty registry ↗
Affiliated network resources provide context. Confirm rules, approvals and property records with the responsible authority.